|
|
| Job Title : |
: |
Fire Protection Engineer |
| Job Reference : |
: |
BBBH1096459_1553016939 |
| Location : |
: |
Paris, �le-de-France, �le-de-France, France |
| Salary : |
: |
Negotiable |
| Posted on : |
: |
Fri Sep 18, 2026 |
| Apply before : |
: |
Thu Dec 31, 2099 |
|
|
|
| Experience required : |
: |
3 years - 6 years |
| Job category: |
: |
HSE/HSEQ |
|
|
|
|
 |
|
 |
|
| Job Description |
 |
EXPERIENCED:
Produce project deliverables on fire protection system design (Active/Passive Fire Protection Philosophy, Fire Water and Foam Demand, Fire Protection System Specification and Datasheets, hydraulic calculation notes, deluge arrangement, Passive Fire Protection Analysis, Equipment Specifications and detailed layouts), ensure the protection technical follow-up of vendors and links with other disciplines in interface.
REQUIRED SKILLS:
For the realization of the present service, the Holder will have to bring the competences described below:
-Experience in fire protection engineering on EPC projects (5 years +).
-Knowledge of fire safety rules applicable to oil & gas facilities.
-Extensive knowledge of fire protection equipment and systems.
-Skills in hydraulic for hydraulic sizing and simulation.
-Capabilities in using AutoCAD.
-French + English (Preferred)
Importance in design fire protection (specification of equipment and systems etc ...) is particularly important! And I repeat, we want someone experienced (5-6 years minimum) in the field. No HSE.
The person will be seconded to the Fire Protection Lead by the department to the project in a Loss Prevention Team of 8 to 9 persons and contribute to the production of the following fire protection deliverables (meaning will be issuer or checker of the deliverable) and activities:
- Fire and Foam Demand of the Facility
- Process Flows Diagrams,
- Piping & Instrumentation Diagrams,
- Hydraulic Calculation Notes
- Fire Protection Equipment Data Sheets, Specifications and Requisitions
- In-line Instrument Data Sheets
- Fire Protection Equipment Layouts
- Deluge System Arrangement in Support of Piping Discipline and 3D Modelling
- Validation of Approved for Construction Piping Arrangement
- Fire Protection Vendor technical follow-up
- Passive Fire Protection Requirement Specification
- Passive Fire Protection Layouts
Therefore, the person will take responsibility for the provision of services under the guidance / supervision of the Fire Protection Lead.
The Facility consists of a Gravity Base Structure (made of concrete) on which Natural Gas Liquefaction Units (Scope by Others) are located on the market. This facility will be in Russia, in North Siberia, on the shore line. The client is the design and construction of the GBS itself more than any other GBS top slab up to a certain elevation below Topside Modules. |
| Apply before : Thu Dec 31, 2099 |
| |
|
|
|
|
|