|
|
| Job Title : |
: |
Securite Indistrielle Coordinator HSED YNFARM |
| Job Reference : |
: |
BBBH1110164_1582797020 |
| Location : |
: |
Paris, �le-de-France, �le-de-France, France |
| Salary : |
: |
Up to £0.00 per annum |
| Posted on : |
: |
Fri Sep 18, 2026 |
| Apply before : |
: |
Thu Dec 31, 2099 |
|
|
|
| Experience required : |
: |
3 years - 6 years |
| Job category: |
: |
HSE/HSEQ |
|
|
|
|
 |
|
 |
|
| Job Description |
 |
The Client will operate an automated vertical farm in the commune of Poulainville for the breeding of insects (mealworms). This farm is intended to produce proteins and oils for animal feed (pets, fish, etc.) as well as a by-product that can be reused in the form of organic fertilizer (insect droppings).
The project includes the establishment of: * Building U100 for the reception of raw materials and food for insects in bulk and their distribution to storage silos (U100-1), * Building U200 for the storage of conditioned raw materials (drums, bags, big bag) and their preparation (grinding, formulation, mixing), * Priming workshop (intersite workshop) for the start of production (U1300), * Ttall U410-411-412 reproduction cells (30 m high), each with 1 automatic stacker crane serving two racks of 23 m high for the reproduction of adult insects, intended to supply larvae to the cells of growth, * Tall U420-U421 cells (35m high), each with 3 automatic stacker cranes serving 2 shelves of racks 25m high for larvae growth, * U300 islands (1 U310 island for reproduction, 1 U320-U321 island for growth) allowing the emptying and changing of breeding tanks, filling them with food and sorting insects before returning to U400, or sending in transformation, * SAS corridor between buildings U300 and U400 * Technical corridor between the U300 buildings and the buildings to the South * Insect transformation workshop (U600,) * Storage building for solid finished products (U700-2) * Liquid effluent management unit (U800), * Unit for hygienization and granulation of excrement to constitute a recoverable organic fertilizer (U900), * Storage unit for chemicals for cleaning in place (CIP) centralized and automated installations (U1000), * Technical tiles housing the air handling units and 4 cooling towers (U1100), * Cold group room (U1100), * Compressed air production room (U1200), * Boiler room with 3 natural gas boilers (U1200), * Unit for the production of softened water and reverse osmosis water (U1200), * Room for the treatment of dead insects, contaminated batches or in the event of non-quality destined for rendering with cold room (U1400), * Building housing the operating offices and the R&D laboratory (U1800), * Maintenance workshop (U1700), * Fire protection installations (local diesel booster with fire reserves-U2200), * Retention basin for potentially polluted water (containment basin), * Rainwater infiltration basin
The HSE Design department covers 4 different disciplines: Industrial Security, Risk Quantification, Environment & Health, Acoustics and Vibration. Industrial Safety Lead and HSED Coordinator of the YNFARM project. Its main contacts will be the Industrial Security, Risk Quantification, Environment and Acoustics engineers of the HSED team, the Project management team and the other disciplines (Processes, Civil Engineering, HVAC, Low and strong currents, etc.), the Client, the Authorities, the Insurer, the Control Offices, the Suppliers. He will be responsible for planning, budget, monitoring progress. He will have to produce deliverables and verify deliverables produced by others.
Carrying out the following tasks: - Emission of philosophies (security concept including detection, fire protection, compartmentalisation, evacuation, smoke extraction, protection of personnel) - Issuance of ATEX documents - Issuance of subdivision plans - Issuance of evacuation plans - Emission of detection plans, and cause & effect matrices for fire & gas detection - Philosophies and technical specifications for fire protection including in particular sprinkler systems - Calculation notes (water demand, hydraulic calculations, ...) - Fire protection PIDs (fire pump, fire network) - Issue of fire protection / personnel protection plans, plans for sprinkled areas - Preparation of specifications for the Fire Lot, Analysis of offers, clarifications, Comparison table of offers, - Seller follow-up of the Fire protection lot (water reserve, fire pump, fire protection equipment (fire hydrants, deluge, water curtain, etc.), sprinkler systems, etc.) including verification of seller documents, - Verification of Fire & Gas detection documents prepared by the seller of the batch High currents / low currents
SKILLS REQUIRED The studies at the expense of the PROVIDER require the following skills: - Mastery of security engineering know-how: Atex, Detection, Constructive provisions relating to fire safety and protection means (in particular sprinklers, compartmentalisation, smoke extraction, evacuation), Protection of personnel. - Applicable codes and standards: French regulations - Hydraulic calculation software (s) |
| Apply before : Thu Dec 31, 2099 |
| |
|
|
|
|
|